NOTE: This is for an older version of WattmonOS (2.x) - so please use EZConfig for later versions.
This explains how to configure your Delta inverter and Secure 445 Power Meter so that the net import/export for the building is maintained at a preset level whenever possible. This is done by reading the active power at the meter which should be connected just after your main electricity meter, and throttling the generation of your inverter whenever required.
Follow these steps to configure your device manually.
power_control=1
powermeter_role=60
(replace the 60 with the number you noted down)power_min=5
(if you want the minimum import to be 5 kW) power_max=10
(if you want the max import to be 10 kW)Save your changes and reboot, your inverter power percentage will now be throttled.
Make sure you have the WattmonOS 2.17 update for this, it is not implemented in previous versions.
In order to do this you will need to install the following configuration file [this is coming soon]. Just save this on your hard disk and follow these instructions: